5/4/16

Today with the started our blog. We assigned our roles and wrote our about me pages.

5/6/16

Today we worked on the "What is the ROV?" page. I also worked on the about me page. Next time I plan to work on completing the ROV base.

5/10/16

In class we got interviewed so we can begin building. We assigned roles and everyone got to work. We also learned about safety and how to use the different tools. I started to cut the PVC pipe but was not able to finish.

5/11/16

Today I finished cutting the PVC an then I drilled holes into the elbows. I also finished putting holes into the pipes. Now we are ready to assemble the main structure.

5/13/16

Today I finished putting the frame together. I added the net to the bottom. As a team we finished with the motors and waxed them. All we have left to do it attach the motors to the structure and test it out.

5/19/16

Toady we finished putting together our ROV. We added to motors and finished building the control. We made sure that the motors would work and spin.

5/20/16

Today we tested our ROV in the small pool. We figured out that one of the motors were wired wrong so it spins the wrong way. The controller of the rov will have to get used to it and figure out how to get used to the controls.

5/24/16

Today we finished adding the final touches to the ROV. We figured out were to put the camera and began testing it.